Sass 9 pour
This one is turning into a multiple day event, with pours being added a day later.
Read MoreGGot a little carried away on this one. Two pours -- the first with a loop inside using that same mold. I had had in mind to simply keep the part on the left, but too much had gotten past the barrier. So I pulled out the mold and settle around the "failed" one. This time a lot of red/oragne/yellow filling that channel was essentially impossible. Epoxy wants to flow and flowed right under.